26/00188/FULLWithdrawnLast updated 26/08/2026, 17:15
Proposals include the erection of a new 67 metre wind turbine to replace an existing 33 metre turbine, alongside associated access track extensions and infrastructure.
Full Local Application
Forfar, UK
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Plans & drawings
Sign in free to viewFull Proposal
Erection of a single 67m wind turbine with associated crane hardstanding, access track extension, and grid connection infrastructure (replacement and repositioning of existing 33m wind turbine)
Application Timeline
Application Registered25/03/2026
Application Validated31/03/2026
Decision Made24/08/2026
Decision Issued24/08/2026
Approximate area shownSign in for the exact location
For neighbours
Access or parking changes
The description mentions access, parking or similar.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.
Case Officer
Applicant
Craignathro Farms Limited