Proposals involve the restoration and repair of existing timber sashes and frames, alongside the replacement of casements and glazing across various elevations.
Additional works include the installation of new secondary glazing systems and the redecoration of windows and doors.
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Full Proposal
On principal elevation (east and return gable on north side), restore existing sashes and frames with some bottom sashes replaced using 4mm float glass and replacement cills and replace dormer casements using 8.15 mm vacuum glazing. Replace existing secondary glazing with new thin frame heritage system. Install new secondary glazing to fanlight over door. On rear & mid-range and south elevation, retain outer frames but replace casements using 8.15 mm vacuum glazing and replacement cills. Redecoration of windows and doors (as amended by drawing nos. 206080-04; -05 and -06 received on 04.08.2026 and amplified by revised quotations received 15.08.2026).
Application Timeline
For neighbours
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.