Submission of details relating to various planning conditions for a residential development phase, covering construction management, landscaping, drainage, and access.
Keep track of this application
Sign in and like this application to get an email when the decision is made.
Plans & drawings
Sign in free to viewFull Proposal
Submission of details required by Conditions 13 (excavations and earth works), 22 (Ecological Construction Method Statement and Ecological Enhancement and Management Plan), 23 (Emission Mitigation Package), 24 (Construction Emissions Management Plan), 27 (dust and noise control and vibration), 28 (Wheel Cleaning), 30 (Arboricultural Method Statement), 32 (written scheme of archaeological investigation), 35 (surface water drainage), 43 (layout, drainage, construction, services and lighting of the proposed access road(s), footways and cycle ways, including the junction(s)), 47 (means of vehicular, pedestrian and cycle access), 50 (materials) and 55 (hard and soft landscaping) of planning permission 20/01988/STVAR - Vistry Phase 2C
Application Timeline
For neighbours
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.