26/30412/CONDETPendingLast updated 26/08/2026, 19:51
Submission of details relating to construction traffic management, parking, drainage, and methodology as required by conditions on a previous planning permission.
Approval of Details req'd by Condition
York Road, York YO43
Get notified about the decision
Sign in and like this application to get an email when the decision is made.
Plans & drawings
Sign in free to viewFull Proposal
Submission of details required by Conditions 17 (Construction Traffic Management Plan (CTMP)), 18 (Temporary vehicle parking, loading, off-loading, manoeuvring and wheel washing facilities for the contractors), 21 (Means of disposal of foul water drainage), 23 (Means of surface water drainage) and 28 (Construction Method Statement) of planning permission 25/01817/STVAR
Application Timeline
Application Registered24/08/2026
Application Validated24/08/2026
Decision MadeN/A
Decision IssuedN/A
Approximate area shownSign in for the exact location
For neighbours
Physical construction works
Build-phase noise, dust and vehicles while works are carried out.
Access or parking changes
The description mentions access, parking or similar.
What the application involves, identified from its description — an indicator, not an assessment. Set your address to see distance and direction.
Case Officer
Applicant
Danum Homes